Quantcast
Get breaking news alerts via email

Click here to manage your alerts
Firefighters confer out side the Nevada Disvory Museum in Reno, Nev., Wednesday Sept. 3, 2014. A minor explosion during a science experiment at the museum burned several children and forced the evacuation of the museum.. (AP Photo/Scott Sonner).
Plant gets Tesla closer to electric car for masses
$5B project » The factory in Reno, Nev., will manufacture batteries for electric vehicles.
First Published Sep 04 2014 04:30 pm • Last Updated Sep 04 2014 06:02 pm

Reno, Nev. • To bring electric cars to the masses, Tesla Motors will transform an expanse of desert where pioneers passed on their way to the California Gold Rush and wild mustangs still roam the hillside.

This time, the rush will be in Nevada, which Tesla chose over four other states as the site for a $5 billion factory that the carmaker projects will crank out enough high-tech car batteries to power 500,000 vehicles annually by decade’s end.

Join the Discussion
Post a Comment

A state synonymous with gambling hit the jobs jackpot — Tesla has said the factory will employ about 6,500 people. That’s a welcome jolt for a tourism-based economy particularly hard hit during the Great Recession.

Nevada’s elected leaders still must deliver on the economic incentives they’ve promised, but if they do as expected, Tesla will open its massive factory at an industrial park outside Reno, according to a person familiar with Tesla’s plans. The person spoke on condition of anonymity because no official announcement had been made. An announcement was scheduled for Thursday afternoon at Nevada’s Capitol.

The biggest lingering question: How much has Nevada offered Tesla to locate here?

Based on CEO Elon Musk’s public statements, the incentives likely total at least $500 million. Gov. Brian Sandoval would have to call a special session of the Legislature to approve tax breaks, grants or other incentives of that magnitude.

Sandoval’s office wouldn’t comment on the package his office negotiated, or anything else about the factory. A spokesman for Tesla Motors Inc., based in Palo Alto, California, said Musk would be at the Capitol in Carson City for the afternoon news conference, but offered no other details.

On Thursday morning, at least a half-dozen road graders, bulldozers and dump trucks were working at the Nevada industrial park behind locked gates. More than a dozen mustangs grazed nearby as sprinkler trucks worked to keep down dust.

Tesla’s choice of Nevada over California, Texas, Arizona and New Mexico takes it a big step closer to mass producing an electric car that costs around $35,000 and can go 200 miles on a single charge. That range is critical because it lets people take most daily trips without recharging, a major barrier to the widespread adoption of electric vehicles.

The "gigafactory," as Tesla calls the project, would bring down the cost of batteries by producing them on a huge scale. Its approximately 10 million square feet, equivalent to about 174 football fields, would be running by 2017. That is when Tesla hopes to introduce its Model 3, which will be about half the price of Tesla’s only current offering, a luxury sedan.


story continues below
story continues below

At present, demand for electric vehicles is small.

Through August, automakers have sold just over 40,000 fully electric cars this year, up 35 percent from a year ago, according to the auto website Edmunds.com. Factoring in plug-in hybrids, electric vehicles still account for just 3.6 percent of all new car sales, a slight drop from last year. Still, government fuel economy standards that will require new cars and trucks to average 54.5 miles per gallon are expected to drive sales.

Tesla’s goal of producing batteries for 500,000 vehicles annually by 2020 has its doubters.

A recent report by Lux Research, a consulting firm, projected that Tesla would sell 240,000 electric vehicles that year — meaning "significant overcapacity" for the factory.

Then again, the factory could be tooled to produce batteries for laptops, phones and even buildings, which could draw on battery power during peak-cost times of day and then recharge them either through solar power or energy drawn from a utility during lower-cost periods. Japanese electronics company Panasonic Corp. is a major co-investor, and will be responsible for the actual manufacturing of the battery cells.

This spring, Musk announced that the company would take the unusual step of spending millions to prepare sites in two states — or perhaps even three — before choosing a winner. The person familiar with Tesla’s plans told The Associated Press a second site still will be prepared, in case Nevada is unable to deliver the incentives it has promised, or possibly to build a second factory.

Tesla has done excavation and other site-preparation work at the Tahoe Reno Industrial Center, where it plans to build the factory. The center is about 15 miles east of Sparks, a Reno suburb founded as a railroad town more than a century ago.

Aside from low tax rates and business-friendly workplace laws, Nevada offered plenty of sun and wind to generate "green" power. The industrial park is only about 200 miles along Interstate 80 from Tesla’s lone auto assembly plant in the San Francisco Bay Area. It’s also near a deposit of lithium, an essential element to produce the battery cells.

U.S. Senate Majority Leader Harry Reid, D-Nev., said Thursday that this ready supply was an important part of Nevada’s bid. He acknowledged at his Clean Energy Summit in Las Vegas that Tesla was coming to Nevada, and said he had spoken with Sandoval about it.



Copyright 2014 The Salt Lake Tribune. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Top Reader Comments Read All Comments Post a Comment
Click here to read all comments   Click here to post a comment


About Reader Comments


Reader comments on sltrib.com are the opinions of the writer, not The Salt Lake Tribune. We will delete comments containing obscenities, personal attacks and inappropriate or offensive remarks. Flagrant or repeat violators will be banned. If you see an objectionable comment, please alert us by clicking the arrow on the upper right side of the comment and selecting "Flag comment as inappropriate". If you've recently registered with Disqus or aren't seeing your comments immediately, you may need to verify your email address. To do so, visit disqus.com/account.
See more about comments here.
Staying Connected
Videos
Jobs
Contests and Promotions
  • Search Obituaries
  • Place an Obituary

  • Search Cars
  • Search Homes
  • Search Jobs
  • Search Marketplace
  • Search Legal Notices

  • Other Services
  • Advertise With Us
  • Subscribe to the Newspaper
  • Access your e-Edition
  • Frequently Asked Questions
  • Contact a newsroom staff member
  • Access the Trib Archives
  • Privacy Policy
  • Missing your paper? Need to place your paper on vacation hold? For this and any other subscription related needs, click here or call 801.204.6100.